Equipment Configuration
1.Equipment features:
2.Equipment Function:
Unwinding-- Lotion Coated--Drying device---Embossing and heating---Slitting ----Rewinding---Discharging
3.Equipment production process:
2 sets of jumbo roll stands(Pneumatic lifting raw paper)---2 sets of Coating system (including automatic adding cream device)---1 set of pressing and conveying device---1 set of small JR cutting (Lengthwise slitting )----1set of cutting between paper rolls and rolls ---1 paper stretch roll ----1 set of rewinding device(air shaft 2 pcs) ----Pneumatic discharge unit.
4.The whole machine with wall type panel, driven by an independent motor,and the tension control can be operated on the PLC.
Technical Parameters
Production speed |
A. When only for cutting, the speed is 200-300 m/min;
B.When produce with embossing unit, the speed is 60-80 m/min;
C. When produce with drying device, the speed depends on the material and drying degree;
D. When produce with coating device, the coating speed is around 150-200m/min, depends on the lotion coating amount .
|
Width of raw material (mm) | ≤2000 |
Cotton towel material weight (g/m²) | 40-80( single layer) |
Diameter of raw material (mm) | ≤1400 |
The max. weight of raw material (kg/roll ) | 800 |
Equipment weight (T) | about 7 |
Equipment power(KW) | about 20.1 KW (380V 50HZ), excluding the dryer and heating |
Equipment over size(L*W*H) (mm) | 14500×2600×2500 |